Below are accounts of just some of the many
projects for which Clear Creek Systems has been called upon to provide
solutions. Click the link for a full account.
Clear Creek Systems, Inc.
installed and operated a 200 gallon-per-minute (gpm) Chitosanenhanced stormwater filtration system for a national
developer. The site was located on a 6-acre lot in a residential area of
Oceanside.
Beaches all across Southern
California are facing major problems from Urban Runoff pollution. As
the population has grown over the decades the volume of Urban Runoff has
increased dramatically. The pollution is not only harmful to the
environment it poses health hazards to people who swim in the polluted
water. more
The City of Napa has faced a perennial
flooding problem due to Development of the Napa River Watershed. The Army
Corps of Engineers is leading a wide range of government agencies to
reduce flooding by returning a portion of the flood plain to its natural
condition. more
A pipeline break in a marsh near the
San Francisco Bay required quick action . Clear Creek Systems was called
upon when standard emergency actions failed to address important issues.
more
Construction of a parking garage at
Reno-Tahoe International Airport required the relocation of a large sewer
transmission line. Contamination from aviation fuel complicated
dewatering.
more
San Francisco area developer needed to
de-water a 14 million gallon pond in order to build a marina. The regional
water board required that sediment pollution be minimized.
more