A good sediment basin maintenance plan includes discharging water after the heavy solids settle out. A draw down filtration system insures solids removal prior to discharge. A filtration system utilizing CCS floating suction and 0. 5 micron filters are a “Best Management Practice” for sediment basin draw down and trench de-watering.
Please wait a moment for design diagram to appear.